{"id":2436,"date":"2024-08-08T05:00:30","date_gmt":"2024-08-08T05:00:30","guid":{"rendered":"https:\/\/tanathi.go.ke\/wp\/?page_id=2436"},"modified":"2024-12-14T11:11:29","modified_gmt":"2024-12-14T11:11:29","slug":"complete-projects-2","status":"publish","type":"page","link":"https:\/\/tanathi.go.ke\/wp\/complete-projects-2\/","title":{"rendered":"Complete projects"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"2436\" class=\"elementor elementor-2436\">\n\t\t\t\t<div class=\"elementor-element elementor-element-4bada1a e-flex e-con-boxed e-con e-parent\" data-id=\"4bada1a\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-d1bb08e elementor-widget elementor-widget-text-editor\" data-id=\"d1bb08e\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>COMPLETED PROJECT<\/strong><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-255f5f7 e-flex e-con-boxed e-con e-parent\" data-id=\"255f5f7\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-da4af16 elementor-widget elementor-widget-text-editor\" data-id=\"da4af16\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Mavoko Drinking Water Supply Project<\/strong><\/p><p><img decoding=\"async\" class=\"size-medium wp-image-3446 alignleft\" src=\"https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/kmc-dam-mavoko-floating-intake-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/kmc-dam-mavoko-floating-intake-300x150.jpg 300w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/kmc-dam-mavoko-floating-intake-768x384.jpg 768w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/kmc-dam-mavoko-floating-intake-600x300.jpg 600w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/kmc-dam-mavoko-floating-intake.jpg 1000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Mavoko Drinking Water Supply Project was funded by Belgium Government and the Government of Kenya and currently construction works is 100% complete and operational.<\/p><p>The project components were: &#8211;<\/p><ol><li>Independent line from Nairobi Water Company,<\/li><li>Rehabilitation of Nol-Turesh line and tanks,<\/li><li>Rehabilitation and de-silting of KMC and Portland dams<\/li><li>New Mavoko water treatment works of 10,000m<sup>3<\/sup>\/day and pumping units,<\/li><li>Construction of 5,000M<sup>3<\/sup> R.C Water storage tank and 1No. 300M<sup>3<\/sup> Steel Elevated Tank.<\/li><\/ol><p>The water supply will benefit 500,000 residents of Mavoko and its environs. Implementation of the project started on 19<sup>th<\/sup> February 2018 to and was completed on 31<sup>st<\/sup> March 2021<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-b318761 e-flex e-con-boxed e-con e-parent\" data-id=\"b318761\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-58fe851 elementor-widget elementor-widget-text-editor\" data-id=\"58fe851\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Wote Water Supply Project Phase II (Emali Town Water Supply Project)<\/strong><\/p><p><img decoding=\"async\" class=\"size-medium wp-image-3195 alignleft\" src=\"https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2021\/04\/Emali-town-water-project-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2021\/04\/Emali-town-water-project-300x150.jpg 300w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2021\/04\/Emali-town-water-project-600x300.jpg 600w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2021\/04\/Emali-town-water-project.jpg 602w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>The project will benefit residents from Kibwezi west Constituency with clean reliable water. The works components include laying of 9.75 Km, Construction of 100m<sup>3<\/sup> Steel Elevated Tank Supply and installation of solar modules at Muuoni River Sump, Supply and installation of dosing units, Construction of 5 No. water kiosks, Drilling and Equipping of 1 No. Borehole.<\/p><p>Implementation of the project started on 3<sup>rd<\/sup> February 2021 and was completed in October 2021 The project is complete and operational.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-0f5554e e-flex e-con-boxed e-con e-parent\" data-id=\"0f5554e\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-fc13288 elementor-widget elementor-widget-text-editor\" data-id=\"fc13288\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Masinga Cluster (Kaewa \u2013 Kangonde Water Supply Project P2)<\/strong><\/p><p><img decoding=\"async\" class=\"size-medium wp-image-3447 alignleft\" src=\"https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/masinga-floating-intake-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/masinga-floating-intake-300x150.jpg 300w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/masinga-floating-intake-768x384.jpg 768w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/masinga-floating-intake-600x300.jpg 600w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/masinga-floating-intake.jpg 1000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>The project intents to supply water to residents of Kaewa and Kangonde with reliable and sustainable source of water.<\/p><p>The project components are Construction of 21km water supply pipeline, Construction of water kiosks, 150m3 water tank, 50m3 water sump and booster pumping unit.<\/p><p>The project is complete and operational<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-aeda145 e-flex e-con-boxed e-con e-parent\" data-id=\"aeda145\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2639e4e elementor-widget elementor-widget-text-editor\" data-id=\"2639e4e\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Solarization of Migwani Water Supply Project<\/strong><\/p><p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-3448 alignleft\" src=\"https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/migwani-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/migwani-300x150.jpg 300w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/migwani-768x384.jpg 768w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/migwani-600x300.jpg 600w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/migwani.jpg 1000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>The project intends to reduce the power bill for the Migwani water supply project by substituting the Kenya Power Grid source of power with solar power thereby making the project more sustainable.<\/p><p>The project components include foundation civil works and fabrication of steel solar mounting structure and the installation of solar modules and electromechanical works with a capacity of 75 Kw. The project is complete and operational<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-5d6fc7a e-flex e-con-boxed e-con e-parent\" data-id=\"5d6fc7a\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-f274b65 elementor-widget elementor-widget-text-editor\" data-id=\"f274b65\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Mavoko Sewerage Project <\/strong><\/p><p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-3420 alignleft\" src=\"https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/Mavoko-Treatment-Works-300x142.jpg\" alt=\"\" width=\"300\" height=\"142\" srcset=\"https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/Mavoko-Treatment-Works-300x142.jpg 300w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/Mavoko-Treatment-Works-768x363.jpg 768w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/Mavoko-Treatment-Works-600x284.jpg 600w, https:\/\/tanathi.go.ke\/wp\/wp-content\/uploads\/2024\/12\/Mavoko-Treatment-Works.jpg 1000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>The project intents to provide sewered connection to residents of Mavoko NHC Estate<\/p><p>The project components include Construction of 1.9km sewer line, purchase of Mavoko water company office and sewer maintenance equipment<\/p><p>The project is complete and operational<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-8c104d2 e-flex e-con-boxed e-con e-parent\" data-id=\"8c104d2\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c9ea436 elementor-widget elementor-widget-text-editor\" data-id=\"c9ea436\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Masinga Cluster Phase 3 (Matuu and Kangonde-Mutwa Mwaki Water Supply Project<\/strong><\/p><p>The project intents to supply water to residents of Matuu, Ikalakala and Mutwa Mwaki with reliable and sustainable source of water.<\/p><p>The project components are Construction of 2km Matuu raising main, steel elevated tank, 8km Mutwa-Mwaki water supply pipeline, rehabilitation of existing 30km Kaewa \u2013 Ikalakala pipeline.<\/p><p>The project is currently at 85% complete and construction works are expected to be completed by June 2022<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-34a93ee e-flex e-con-boxed e-con e-parent\" data-id=\"34a93ee\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1533b9d elementor-widget elementor-widget-text-editor\" data-id=\"1533b9d\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Manooni Alt; Nol-Turesh-Kikumini-Ithumba Water Supply Project<\/strong><\/p><p>The project intents to supply water to residents of Ithumba and Kikumini in Makueni County with reliable and sustainable source of water.<\/p><p>The project components include construction of offtake from the existing nolturesh line, laying of 30km pipeline, construction of 100m3 masonry tank, connection to existing kiosks in Kikumini<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-463136c e-flex e-con-boxed e-con e-parent\" data-id=\"463136c\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-c656f9e elementor-widget elementor-widget-text-editor\" data-id=\"c656f9e\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Mavoko Water &amp; Sewerage Interventions &#8211; Extension of Pipeline<\/strong><\/p><p>The project aims to increase water supply to Gimu Estate, Jam City, and Great Wall Gardens within Mavoko Sub County.<\/p><p>The project components are laying of 6 Km distribution pipeline and Provision of 300 No. water meters to MAVWASCO<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-9d32f27 e-flex e-con-boxed e-con e-parent\" data-id=\"9d32f27\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-9a08cf6 elementor-widget elementor-widget-text-editor\" data-id=\"9a08cf6\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>Drilling and Equipping of Boreholes<\/strong><\/p><p>Tanathi Water Works Development Agency has implemented the following boreholes within Makueni, Machakos, Kitui and Kajiado<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-5500cea e-flex e-con-boxed e-con e-parent\" data-id=\"5500cea\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a66101c elementor-widget elementor-widget-text-editor\" data-id=\"a66101c\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ol><li>Kavuthu Borehole Project<\/li><li>Oldonyo Sampu Borehole Project<\/li><li>Nkaantu Borehole Project<\/li><li>Kaluasi Borehole Project<\/li><li>Kathemboni Borehole Project<\/li><li>Munyiiti Ikombe Borehole Project<\/li><li>Kwa Mbita\/Kaveta Ilooi primary Project<\/li><li>Musa Mwambani borehole<\/li><li>Kisaju Primary Borehole Project<\/li><li>Malilima Borehole<\/li><li>Empuyiangat Communituy Borehole<\/li><li>Sanare Village Borehole<\/li><li>Nakeel Secondary School<\/li><li>Olkeri Secondary School<\/li><li>Olomayiana Community<\/li><li>Thange Water Project<\/li><li>Mulundi (Yuumbisye) Primary School Borehole<\/li><\/ol>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>COMPLETED PROJECT Mavoko Drinking Water Supply Project Mavoko Drinking Water Supply Project was funded by Belgium Government and the Government of Kenya and currently construction works is 100% complete and operational. The project components were: &#8211; Independent line from Nairobi Water Company, Rehabilitation of Nol-Turesh line and tanks, Rehabilitation and de-silting of KMC and Portland [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-2436","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/tanathi.go.ke\/wp\/wp-json\/wp\/v2\/pages\/2436","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tanathi.go.ke\/wp\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tanathi.go.ke\/wp\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/tanathi.go.ke\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/tanathi.go.ke\/wp\/wp-json\/wp\/v2\/comments?post=2436"}],"version-history":[{"count":19,"href":"https:\/\/tanathi.go.ke\/wp\/wp-json\/wp\/v2\/pages\/2436\/revisions"}],"predecessor-version":[{"id":3451,"href":"https:\/\/tanathi.go.ke\/wp\/wp-json\/wp\/v2\/pages\/2436\/revisions\/3451"}],"wp:attachment":[{"href":"https:\/\/tanathi.go.ke\/wp\/wp-json\/wp\/v2\/media?parent=2436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}