+254-712351104

Search

Welcome to Tanathi Water Works Development Agency

MULUNDI/YUMBISYE BOREHOLE WATER PROJECT

Mulundi borehole water project is located at Mulango ward in Kitui Central Constituency in Kitui County GPS Coordinates (Lat: -1.398212 Log: 38.010920 and Alt: 1130.3 a.s.l). The borehole was drilled and equipped serving the school with water by the time of visit.

 

The borehole is equipped with the following;
a. Solar powered submersible pump was installed in the borehole and functional.
b. Solar panel mounting steel system/structure was installed.
c. STD Water Kiosk structure was in place.
d. All pipelines and fittings were done.
The project is completed handed has been handed over to the school management.It is serving the school and the surrounding community.


Pictorial evidence

 

                  

The solar panels mounted on a steel tower inside the school compound and the stand pipe where the pipe on the ground is getting water from.
GPS-CORDINATES
Latitude: -1.398212
Longitude: 38.010920
Altitude: 1130.3

      

The gate valve chamber which is not covered as the lid broke due to poor curing after construction.
GPS-CORDINATES
Latitude: -1.398212
Longitude: 38.010920
Altitude: 1130.3

The water kiosk at the edges of the school compound.

GPS-CORDINATES

Latitude: -1.398212

Longitude: 38.010920

Altitude: 1130.3